Posts Tagged ‘
project ’
Jan 13th, 2012 |
By Dan (CSFW)
Another Black Pearl is leaving the shop this weekend! AND, it’s an international order to boot. Over the summer I was commissioned to build it by a customer from Ottawa, Ontario. I finished work on it this weekend. He’s driving over on Sunday to pick it up. Full details [...]
Posted in Kayaks, Projects |
4 comments
Tags: Bjorn Thommason Design, Black Pearl, carbon fiber, Greenland, high-performance, kayak, project, sea kayak, strip-built
Jan 4th, 2012 |
By Dan (CSFW)
Björn Thommason, the designer of the fabulous Black Pearl sea kayak, recently posted a short article on his website promoting my current build. The original is in Swedish. He has yet to post his usual English translation. The Google Translate version is quite clear (which is actually scary). Not sure what “Dancing construction methodology” or “Scuba” was supposed to be… (Th 1/5/12: His English version is up… Google was pretty close http://www.thomassondesign.com/nyheter/inspirerande-black-pearl-bygge On the [...]
Posted in Featured, Kayaks, Projects |
4 comments
Tags: Bjorn Thommason Design, Black Pearl, construction, project, sea kayak, strip, Vinaccia
Jan 22nd, 2011 |
By Dan (CSFW)
Scott recently launched the “Neytiri” Hybrid Night Heron… in a local pool. Oh well. It IS winter in New England. He posted a few videos on his blog. Below is an except: I finally got Neytiri over to water today – too bad it was chlorinated instead of salty!! However, [...]
Posted in 2010 "Neytiri" Night Heron (CT), Kayaks |
Comments Off
Tags: Hybrid, launching, Night Heron, project, rolling, sea kayak
Dec 13th, 2010 |
By Dan (CSFW)
Work from 11/24/2010 through 12/11/2010 We’re nearing the end! In this installment I’ll take care of the final outfitting. I’ll coat the hull bottom with our tough graphite mixture, add the footbrace foam, make the deck toggles and run the decklines. With the deck and hull sides clear coated by [...]
Posted in 2010 "Neytiri" Night Heron (CT) |
Comments Off
Tags: carbon fiber, construction, graphite, Greenland, Night Heron, project, sea kayak
Dec 3rd, 2010 |
By Dan (CSFW)
Work from 11/30/2010 though 12/2/2010 Pretty sharp, huh? I had the deck and sides of the hull just got clear-coated with three coats of DuPont ChromaPremier 72700S urethane. The bottom will be coated in our tough graphite. I picked it up last night. I don’t paint my own boats any [...]
Posted in 2010 "Neytiri" Night Heron (CT) |
Comments Off
Tags: clear coating, construction, graphite, Night Heron, project, urethane